86-15268886333

News

Home / News / Industry News / Installation steps and precautions f土亮or the faucet?

Installation steps an裡遠d precautions for the fau去哥cet?

Since the installation視議 of the faucet is an important step in the年照 use of the faucet, the instal男綠ler needs to handle it carefully, s樂海o the following five insta很頻llation steps need to be 遠資clarified:

1. Preparation of installation tool好行s First prepare the installation too亮她ls and check whether the supporting 計木parts are complete before i科也nstallation. Common fa劇花ucet parts are: hoses, rubber was哥數hers, showers, drain外音ers, crutches, decorative caps, et術很c.

2. Clean the faucet before install說我ation and flush it with wat放業er, wash the sediment and impuriti外放es in the water pipe, remov來草e the debris in the installati和知on hole, and check that the acce身鐘ssories in the box ar船近e not mixed with impurities, 銀可so as not to block o金唱r wear the ceramic va海化lve core .

3. When the left hot water a票志nd the right cold water take over, r白來emember that the left is h計問ot water and the right is cold water, 低司and the distance between用紅 the two pipes is 100mm-2樂吧00mm. After fixing the position o喝話f the water inlet joint,服音 remove the faucet, and i小劇nstall the faucet after th行校e wall plastering work is comple們有ted to prevent the surface 笑秒coating of the faucet from be村章ing worn and scratch著是ed

4. When installing t購業he single-hole basin faucet, a specia木說l angle valve must be selec事章ted, and the angle val兵數ve must be fixed to the近錯 hot and cold water pipes out 工筆of the wall. When yo秒這u find that there is a di事鄉stance between the angle valve and th從線e water pipe on the faucet, buy a s間村pecial extension pipe to connect機事 it. Here is a reminder from個事 Jiuzheng Building Mat睡議erials Network that you must not use ot工短her water pipes to connect, bec熱業ause if the water pr資電essure is high, it will easily 什鐵fall off and leak wa知多ter, which will cause you loss. If 喝去the inlet pipe is too long to exceed t報冷he outlet pipe, the pa看技rt can be cut off as ne能土eded. If the angle is not suitable, it 還東can be bent to the required pos如農ition appropriately.

5. Installation of s黑現hower and bathtub faucets. After 城長purchasing a concealed faucet, the va到書lve core of the faucet 體劇is generally embedded in the wa靜妹ll. Before embedding, you must p志城ay attention to the thic書綠kness of the bathroom wall. If the wa訊煙ll is too thin, the valve co唱店re will not be able 玩作to Buried. Do not re北多move the plastic protect制雨ive cover of the valve core eas知呢ily during pre-embedding, so as to av有機oid damage to the valve core by cem請上ent and other chores during pr得就e-embedding. In addition, yo醫飛u should pay attention to the up校用 and down, left and right用裡 directions of the sp玩暗ool when embedding the s兒開pool, so as not to embed t新說he spool incorrectly. When the wall什來-mounted faucet is embedded 照暗in the water inlet pipe, ther術舞e is a deviation in the size, and the醫黑 adjustable crutches can be used to但這 adjust the position.