There are two ways to install 窗山the shower head, one is購金 surface-mounted and the oth河影er is concealed-mounted. Taking t窗用he surface mounted type as an ex都業ample, the specific i理通nstallation process of the shower is as follows:
1. Determine the size. Afte計姐r measuring the size o我新f the shower head, determine 綠務the width and overall height of the林體 fixed distance when the showe森聽r head is installed o鄉姐n the wall. The distanc水朋e between the faucet an生紅d the ground is generall照物y about 60cm.
2. Punch holes. Drill holes acc機銀ording to the measured size, be careful計間 not to penetrate the 我喝water pipes in the w妹能all, and wrap raw tape at the joints t些的o prevent the water pipes from leakin生放g.
3. Device accessories. Screw東紙 the accessories inside the開劇 shower to the wall, inc費下luding the faucet and the 窗大entire bracket.
4. Check the device. Finally, install 票廠the shower head on the shower 金輛bracket. After installation, che都問ck whether the level他雪 is sufficient, open t湖商he faucet at the same tim外呢e, remove the impurities in少白 the hose, and check whether the no謝綠zzle can be used normally.拿師